Forgot to log time in Jira? Rebuild the week from evidence you already have, then stop needing to
Rebuild a week of Jira worklogs in under an hour from your calendar, git, pull requests, chat and browser history, with rounding rules that keep it honest.
Contents
If you forgot to log time in Jira, you can still rebuild the week, because Jira accepts worklogs for past days: set Date started to the real day and the entry lands where it belongs. The harder part is knowing what to write, and for that your tools kept better notes than you did. Your calendar, git, GitHub and Slack all kept timestamps. Collecting them takes under an hour, and the result is a timesheet you can defend. The last section is about the tool that makes the hour unnecessary, which is the one I build.
Collect the evidence before you open Jira
Opening the Log work dialog first is how a week becomes five entries of eight hours. Gather first, write second.
-
Calendar. Read the week. Every meeting is a fixed block with a start, an end and usually a project or issue in the title. These go down first because they do not move.
-
Git. Your commits in each repository you touched, with day and hour. Run it in each repository, or loop over them:
for repo in ~/src/*/; do
git -C "$repo" log --all --author="$(git config user.email)" \
--since="last monday 00:00" --date=format:"%a %H:%M" --format="%ad %s"
done
A commit marks the end of a stretch of work rather than the start, so read the gap before each one as the work. If your branches carry issue keys, the key is in the line already.
-
Pull requests. Reviews you wrote leave no commit. In GitHub search,
reviewed-by:@me updated:>=2026-10-19(use your Monday's date), then the same withauthor:@me. The timestamps on your review comments are the evidence. -
Chat. In Slack, search your own messages for the week and read them by day. The incident thread and the long design argument are work that leaves no other trace.
-
Browser history. Filter by day. Look for issue keys in tab titles, and for the research blocks: forty minutes of documentation with no commit at the end is still forty minutes.
-
Jira itself. The activity on each issue shows your comments and transitions with timestamps, and this lists the issues assigned to you that changed this week:
assignee = currentUser() AND updated >= startOfWeek()
Add OR issuekey in updatedBy(currentUser(), startOfWeek()) to catch issues you touched without owning.
Lay out one day at a time
Write down the first and last timestamp you have for the day. Place the calendar blocks. Fill the gaps between commits. Drop the reviews and the chat threads into what is left. What remains is unexplained time, and the labels for it are "research on X" if the browser history says so, "not work" if it was lunch, and "unknown" if it is unknown.
Three rules keep the result defensible.
Round per block, to fifteen minutes. Rounding the day to eight hours afterwards is the thing a timesheet exists to prevent.
The day's total is bounded by the evidence. First commit 09:40, last message 18:10, minus an hour for lunch: that day is at most seven and a half hours. Nine because nine felt right is how a week ends up at 45.
Unknown stays unknown. Twenty minutes you cannot place go on nothing.
Write the worklogs with the right dates
Now Jira. One worklog per issue per day, Date started set to the real day and, if you have it, the real start, time in shorthand like 2h 15m. Logging all of the reconstruction with Friday's timestamp is the other common error, and it breaks every per-day report built on your worklogs.
Never doing this again
Everything above worked because the evidence already existed. The hour went into collecting it from six places and lining it up by hand. That is the step a local automatic time tracker removes.
Planim records most of this evidence as it happens: the focused app and window title, browser tabs on macOS, idle time and screen lock, file edits and the git branch. It keeps all of it in a database on your own computer and never uploads it.
On Friday, or on Tuesday at 17:30, press Analyze and the timeline shows the day cut into drafts, most with a proposed Jira issue and the evidence that produced it: the key in the branch, the URL of the pull request, the nearest past verdict. You confirm with Enter, reassign with R, mark it Not work with I, press N for the next one that needs a look, and press Push worklog. Only confirmed drafts are sent, as ordinary worklogs with their start times, authored by you.
It will ship for macOS 14 and Windows 10/11. If your Fridays look like the first half of this post, leave an address below.